Monday: Layed out the floor plan to our tiny home in the classroom.....Will this be the final layout?
The layout below has a 3' x 8' bathroom at the top of the photo. The center area would be the kitchen and the bottom of the photo area the living room.
Alt. Placing the kitchen at the lowest area of the photo. The kitchen would be 8' long.
Tuesday: Tuesday was to be the construction start date of the trailer. Discovered one problem in the layout of the trailer. The metal undersupport framing where the plywood pieces but together was slightly off. Causing a delay. Leveled the trailer.
Wednesday: On Wednesday the classes made the necessary adjustment to the undercarriage to support the edge of the plywood and seal the area next to the wheel wells. The classes also began cutting the insulation and placed it between the metal studs.
Framing in around the wheel wells.
Thursday: Added sheet metal above the wheel wells and finished the installation of the insulation. We will do the sealing of the undercarriage later in the project.