Tuesday, November 9, 2021

Students cont. work on the tiny home




  Today the students continued with the work on the tiny home. Work included caulking of trim pieces, cont. framing of the reading nook/ table bench/exterior trim above the front door. The students also completed the pre-fabrication of the raised planter irrigation lines. The lines were transported to the farm and placed into place. All that is left is the final connection to the localized shut-off valve at each of the raised planters.




No comments:

Post a Comment