Today the students continued with the work on the tiny home. Work included caulking of trim pieces, cont. framing of the reading nook/ table bench/exterior trim above the front door. The students also completed the pre-fabrication of the raised planter irrigation lines. The lines were transported to the farm and placed into place. All that is left is the final connection to the localized shut-off valve at each of the raised planters.
No comments:
Post a Comment