After a 14 month delay due to Covid construction has begun back in Ernest on the tiny home! Today four sheets of siding were placed onto the exterior walls.
Equipment was received from a purchase by Andrew Stager at the district for the HHS construction dept. We received two - two-story scaffolding units and a one-story scaffold, two interior workbenches, and an assortment of tools. The tools consisted of clamps, two hand saws, two power drills, 20 safety glasses, 15 tool belts, utility knives, 2' and 4-foot levels,
The students put together all of the scaffolding, but only made up one of the two-foot towers. The students also put together the interior workbenches.