Today the students and I installed the drip edge metal and 2nd ply (final) roofing! For the edge metal we placed a second 9"strip of Flintflash and set the edge metal in a bonding agent and primed the edge metal. We nailed the edge metal at a min. of 6"OC. We then laid the second and final cap sheet on the roof. On the cap sheet we nailed 16" OC at the 3 inch edge strip. We made one penetration for a 1 1/2 inch VTR. We placed the vent cap on top of the exist midply, placed bead of caulk and nailed it down with roofing nails. We then laid another 9" step of midply before placing cap sheet over it. We then beaded around the edge of the cap sheet and metal.
Thursday, February 27, 2020
Wednesday, February 26, 2020
Installed Base Coat Roofing
On Monday installed the peel and stick base coat on the roof. On Wednesday installed a nine inch strip of the base coat around the perimeter of the roof prior to the installation of the drip edge.
Monday, February 24, 2020
W5 Feb 24-28
Week 5 Activities:
Monday: Install roofing base coat. 1st coat of a two part peel and stick system.
Tuesday: Periods 4 & 5 participating in Cabrillo Elementary Visit
Wednesday: Install 9" strip around perimeter of roof.
Thursday: Install Roof Drip Edge
Friday: Pancakes!
Monday: Install roofing base coat. 1st coat of a two part peel and stick system.
Tuesday: Periods 4 & 5 participating in Cabrillo Elementary Visit
Wednesday: Install 9" strip around perimeter of roof.
Thursday: Install Roof Drip Edge
Friday: Pancakes!
Friday, February 21, 2020
Wednesday, February 19, 2020
Week 4 Feb 17 -21
I spent most of the day on Monday at Lowe's and purchasing special order items such as the roofing for the tiny home.
This week!
Opening Assignments:
Monday no school
tues: OA find a silent film on Google and place on your blogger
Wed: Favorite movie and place a link
Thurs: Scariest movie you have scene. Place a link to YouTube
Friday
This week!
Opening Assignments:
Monday no school
tues: OA find a silent film on Google and place on your blogger
Wed: Favorite movie and place a link
Thurs: Scariest movie you have scene. Place a link to YouTube
Friday
Saturday, February 15, 2020
Friday, February 14, 2020
Fire block Completed
Today, Friday 2-14 the students completed the fire blocking at the 48-inch level. We discussed design issues for clothing storage, kitchen storage, and cooktop location today. A couple of cool ideas came forward. In regards to the clothing storage we decided instead of shelving next to the entry of the tiny home we would put a clothing closet.
In the kitchen, it was decided that we could integrate some type of storage into the 2x6 loft framing that could hold kitchen items. As far as the location of the cooktop burners. It was decided to move them to the right closer to the bathroom and placing a microwave above the burners allowing for an exhaust fan.
We still have not come up with a design location for the TV entertainment center.
This week we completed the installation of the plywood on the tiny trailer. The roof framing and the roof still needs to be installed. This week we had to repair the coop box, it was knocked off by a student leaning against it.
Also, a PO was placed with the UUSD for the materials needed to complete the tiny home!!!!!
In the kitchen, it was decided that we could integrate some type of storage into the 2x6 loft framing that could hold kitchen items. As far as the location of the cooktop burners. It was decided to move them to the right closer to the bathroom and placing a microwave above the burners allowing for an exhaust fan.
We still have not come up with a design location for the TV entertainment center.
This week we completed the installation of the plywood on the tiny trailer. The roof framing and the roof still needs to be installed. This week we had to repair the coop box, it was knocked off by a student leaning against it.
Also, a PO was placed with the UUSD for the materials needed to complete the tiny home!!!!!
Thursday, February 13, 2020
Monday, February 10, 2020
Week 3 Feb 10-14
Note Monday, December 10 is a school holiday.
This week.....
Complete the roof on the tiny trailer.
Change the kitchen window size on the tiny home kitchen, then fill the area.
Check trailer siding nailing.
Cut siding for the upstair window.
Begin discussion on electrical.
Opening Assignments:
Mon no school
Tues: Chickens how long to hatch
Wed. Someone you admire
Thurs. Best part of your day
Fri: History of Valentines Day
This week.....
Complete the roof on the tiny trailer.
Change the kitchen window size on the tiny home kitchen, then fill the area.
Check trailer siding nailing.
Cut siding for the upstair window.
Begin discussion on electrical.
Opening Assignments:
Mon no school
Tues: Chickens how long to hatch
Wed. Someone you admire
Thurs. Best part of your day
Fri: History of Valentines Day
Funding Approved!
The new funding was approved for the tiny home! I opened an account at Lowe's and made my first purchase on Monday, Feb 3! The week of Feb 3-7was spent finishing up projects out on the farm. While we were waiting on the funds the class participated in a few extracurricular activities. The class helped been the seed starting area next to my classroom, the class also started building a tiny trailer that will be used to transport chickens and goats. The class also helped build two additional individual chicken cages in the existing chicken coop. The class also helped add some shelving to the storage shed! So in recap the construction classes.
1. Build seed area
2. Build a tiny trailer
3. Build chicken coop cages
4. Add storage shelving in the shed
5. Helped with the new tomato trellis in the garden.
1. Build seed area
2. Build a tiny trailer
3. Build chicken coop cages
4. Add storage shelving in the shed
5. Helped with the new tomato trellis in the garden.
Thursday, February 6, 2020
Subscribe to:
Posts (Atom)