Wednesday, January 18, 2023

Cutout for waste lines installed in bathroom

 Toilet Drain


Shower Drain


Someone's down there!

All electrical runs complete

 All of the interior electrical runs in the tiny home are complete and have been tested! Next is the tie-in of the electrical panel. Most of the insulation has been reinstalled as well.  We have also begun prepping for the plumbing and waste line installation.


We hope to begin the second semester with the installation of the interior wall covering.



The insulation man!



This will be the electrical connection point


50 Amp Connection.



This is the area where the vent pipe will come through the roof. We may cut this out and use a flat vent opening.