Monday, September 25, 2023

Construction Class Update

As of this post, teachers have yet to be hired to continue the construction class at HHS. I know the new principal Chris Beason and  Dr. Andrew Stager are working on re-establishing the program. As for Mr. Connor he has been traveling in Europe having just completed the Tour du Mont Blac Hike. The hike was 110 miles, 12 days around Mt. Blanc, two weeks in Paris, France and Normandy France,  and a week on Lake Powell.

In 2023 the Farm and Construction Classes were involved with the Upland JH Carnival

 



Oh and by the way HHS Received the Model Continuation Award for 2023!

 Hillside High Teachers attend the Awards Ceremony in San Diego. Approximately 20 Continuation High Schools in the state of California receive the award per year. The award lasts for three years before a renewal process. HHS has received the award three times.




June 9, 2023 Construction Class Teacher MR. R Connor Retires

 


June Update to Tiny Home


 

Rocketry in the Construction Class



 

Elementary School Visits to HHS Family Farm


 


May Update .... Tiny Home














 

Twin Day at HHS....Hippies?




 

April Tiny Home Update







 

Thursday, April 6, 2023

Snow shoeing over spring break in Lake Tahoe area.

 


Tiny Home Update

 Green Board Installation in the Bathroom



Drywall installation on the first floor of the home.






An electrical outlet is installed for future garbage disposal.



A cable for solar panels is installed for future installation.


Wednesday, January 18, 2023

Cutout for waste lines installed in bathroom

 Toilet Drain


Shower Drain


Someone's down there!

All electrical runs complete

 All of the interior electrical runs in the tiny home are complete and have been tested! Next is the tie-in of the electrical panel. Most of the insulation has been reinstalled as well.  We have also begun prepping for the plumbing and waste line installation.


We hope to begin the second semester with the installation of the interior wall covering.



The insulation man!



This will be the electrical connection point


50 Amp Connection.



This is the area where the vent pipe will come through the roof. We may cut this out and use a flat vent opening.